Accelerating the
Industrial Internet of Things
Create New Record
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (2)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (2)
  • (2)
  • (2)
  • (1)
    ANDOR
  • (2)
Compare
2 case studies
Case Study missing? Just let us know via Add New Case Study.
Inauguration of ABB’s 315kW solar rooftop power plant
Inauguration of ABB’s 315kW solar rooftop power plant
Inauguration of ABB’s 315kW solar rooftop power plant
ABB
With the newly launched ABB Al-Quoz Solar Power Station, there is a need for the plant to be energy-efficient in order to ensure the benefits of renewable technologies, their seamless integration into the existing electrical grid and reinforce Dubai's position as a world-class smart city.


Industries: Equipment & Machinery
Functions: Quality Assurance
Capabilities: Asset Tracking & MonitoringData Acquisition & ManagementEnergy Management
Hardware:
Software:
Services:
Remote Operation and Services for Oil Production in the Arctic Circle
Remote Operation and Services for Oil Production in the Arctic Circle
Remote Operation and Services for Oil Production in the Arctic Circle
ABB
World’s largest FPSO vessel ever built needs to meet the high standards linked to on-site safety and a healthy working environment adapted to the climatic conditions in the Barents Sea


Industries: Energy
Functions: Maintenance
Capabilities: Asset Tracking & MonitoringData Acquisition & ManagementEnergy Management
Hardware:
Services: