Case Studies.

Add Case Study

Our Case Study database tracks 8,303 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.

Filters
  • (3)
    • (2)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
    • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (4)
  • (2)
  • (1)
  • (1)
  • (4)
Selected Filters
4 case studies
Sort by:
Time to Market, Time to Volume, Time to Money - ABB Industrial IoT Case Study
Time to Market, Time to Volume, Time to Money
ABB
Time is essential when it comes to introducing new products to the market. Many clients need to mass manufacture a product in a very short time. Their requirements put Foxconn under substantial pressure.
Download PDF
System 800xA at Indian Cement Plants - ABB Industrial IoT Case Study
System 800xA at Indian Cement Plants
ABB
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Download PDF
Plastic Spoons Case study: Injection Moulding - ABB Industrial IoT Case Study
Plastic Spoons Case study: Injection Moulding
ABB
In order to meet customer expectations by supplying a wide variety of packaging units, from 36 to 1000 spoons per package, a new production and packaging line needed to be built. DeSter wanted to achieve higher production capacity, lower cycle time and a high degree of operator friendliness with this new production line.
Download PDF
Robot Saves Money and Time for US Custom Molding Company - ABB Industrial IoT Case Study
Robot Saves Money and Time for US Custom Molding Company
ABB
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.
Download PDF

Contact us

Let's talk!
* Required
* Required
* Required
* Invalid email address
By submitting this form, you agree that Asia Growth Partners may contact you with insights and marketing messaging.
No thanks, I don't want to receive any marketing emails from Asia Growth Partners.
Submit

Thank you for your message!
We will contact you soon.