Accelerating the
Industrial Internet of Things
Create New Record
    ANDOR
  • (3)
    ANDOR
  • (1)
  • (1)
  • (1)
    ANDOR
  • (1)
    ANDOR
  • (2)
  • (1)
    ANDOR
  • (2)
  • (1)
  • (1)
  • (1)
  • (1)
    ANDOR
  • (2)
  • (2)
  • (1)
  • (1)
    ANDOR
  • (3)
Compare
3 case studies
Case Study missing? Just let us know via Add New Case Study.
Robot Saves Money and Time for US Custom Molding Company
Robot Saves Money and Time for US Custom Molding Company
Robot Saves Money and Time for US Custom Molding Company
ABB
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.


Industries: Equipment & Machinery
Functions: Discrete Manufacturing
Capabilities: Overall Equipment EffectivenessQuality Assurance & Control
Hardware:
Software:
Services:
Inauguration of ABB’s 315kW solar rooftop power plant
Inauguration of ABB’s 315kW solar rooftop power plant
Inauguration of ABB’s 315kW solar rooftop power plant
ABB
With the newly launched ABB Al-Quoz Solar Power Station, there is a need for the plant to be energy-efficient in order to ensure the benefits of renewable technologies, their seamless integration into the existing electrical grid and reinforce Dubai's position as a world-class smart city.


Industries: Equipment & Machinery
Functions: Quality Assurance
Capabilities: Asset Tracking & MonitoringData Acquisition & ManagementEnergy Management
Hardware:
Software:
Services:
ABB Brazil Saved 30% on Testing Time Thanks to Panaya Test Center
ABB Brazil Saved 30% on Testing Time Thanks to Panaya Test Center
ABB Brazil Saved 30% on Testing Time Thanks to Panaya Test Center
ABB
The stakes are high for ABB Brazil, an organization with five business divisions. Brazil has one of the most complicated tax systems in the world and SAP system errors can cause big losses for the company. Each release of new functionality is very risky, hence ABB Brazil faces huge testing challenges.Complex business scenarios with little or no documentation available.Several system changes (new functionalities, improvements, and bug fixing) being released every week which requires a huge effort to execute regression tests.The major challenge during the UAT is to keep track of all activities, spread across multiple areas/ locations and keep everything under control.


Industries: Equipment & Machinery
Functions: Product Development
Hardware:
Software:
Services: