Accelerating the
Industrial Internet of Things
Create New Record
    ANDOR
  • (2)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (1)
    ANDOR
  • (2)
    ANDOR
  • (2)
  • (2)
  • (2)
    ANDOR
  • (2)
  • (1)
    ANDOR
  • (2)
Compare
2 case studies
Case Study missing? Just let us know via Add New Case Study.
Hardware and Software Upgrade Boosts Power Output for TransCanada
Hardware and Software Upgrade Boosts Power Output for TransCanada
Hardware and Software Upgrade Boosts Power Output for TransCanada
General Electric (GE)
As TransCanada's GE turbines were nearing end of life at their Ravenswood and Alberta locations, they required cleaner, more viable solutions to meet the growing power demands of their constituency, with the Ravenswood location serving over 20% of New York City.


Industries: Equipment & Machinery
Functions: Maintenance
Capabilities: Energy ManagementEnvironmental MonitoringOverall Equipment Effectiveness
Hardware:
Software:
Services:
Kospo Met Increasing Market Demands with Existing Turbine Upgrade
Kospo Met Increasing Market Demands with Existing Turbine Upgrade
Kospo Met Increasing Market Demands with Existing Turbine Upgrade
General Electric (GE)
Kospo needed a way to provide a higher reserve margin. Given the rise in demand due to a positive economic environment, Kospo looked to upgrade their fleet of 7F gas turbines to provide additional capacity while controlling emissions.


Industries: Equipment & Machinery
Functions: Quality Assurance
Capabilities: Environmental Health & SafetyEnvironmental Monitoring
Hardware:
Software:
Services: