Accelerating the
Industrial Internet of Things
Create New Record
    ANDOR
  • (2)
    ANDOR
  • (2)
    ANDOR
  • (1)
    ANDOR
  • (1)
  • (1)
  • (1)
  • (1)
    ANDOR
  • (2)
  • (1)
    ANDOR
  • (2)
Compare
2 case studies
Case Study missing? Just let us know via Add New Case Study.
E.ON Gets Faster, Lower Cost Cycles with OpFlex Solutions
E.ON Gets Faster, Lower Cost Cycles with OpFlex Solutions
E.ON Gets Faster, Lower Cost Cycles with OpFlex Solutions
General Electric (GE)
E.ON's plants ran 4000+ hours per year, now see fewer than 1000+ hours of profitable operation. E.ON needed a fast, reliable and low-cost cycle plants.


Industries: Energy
Functions: Maintenance
Capabilities: Overall Equipment Effectiveness
Software:
Services:
American Eagle Achieves LEED with GE LED Lighting Fixtures
American Eagle Achieves LEED with GE LED Lighting Fixtures
American Eagle Achieves LEED with GE LED Lighting Fixtures
General Electric (GE)
American Eagle Outfitters (AEO) was in the process of building a new distribution center. The AEO facility management team decided to look at alternate options for lighting layout that could provide energy and maintenance savings. AEO would need a full-time maintenance employee just to replace burned-out fluorescent tubes.


Industries: Energy
Functions: Maintenance
Capabilities: Energy Management
Hardware:
Services: