29% Energy Savings with Industrial Optimisation

ionSign Oy

29% Energy Savings with Industrial Optimisation

ionSign Oy ionSign Oy
View Full Case Study
Contact Vendor
Feature New Record
OVERVIEW
A leading global Chinese LCD panel manufacturer needed to ramp up cost competitiveness and carbon footprint. It needed to cut down on the 47 GWh of annual electrical energy used for compressed air production at the manufacturing site.
ionSign's client, Enersize has over 35 years' experience of providing systematic compressed air systems (CAS) energy efficiency optimisation. The Chinese LCD panel manufacturer is one of Enersize's clients.
Essentially with the data gained by three ionSign's Gluon GMU191 units, Enersize planned and employed optimisation measures, passing on significant savings to the Chinese LCD panel manufacturer. Within 5 months of kick-off, Enersize had delivered energy savings of 15%. Further optimisation measures have been planned already to drive energy savings to 29% over the next 12 months.
Crucial elements of the compressed air system including energy consumption, pressure, flow and dew point in key process locations.
IOT
Mature (technology has been on the market for > 5 years)
OPERATIONAL IMPACT
Systematically and continuously improved energy efficiency
Transparency – real-time status view anywhere
Energy efficiency training for staff by Enersize
QUANTITATIVE BENEFIT
Significant financial savings – 15% within the first 5 months
No capital investment
Significant improvement in carbon footprint
TECHNOLOGY

Fatal error: Call to a member function getLabel() on null in /efs/iotone.com/module/Application/view/application/common/IoTSnapshot_view.phtml on line 9