Search Result.

Case Study
1
Case Studies
1
Vale Fertilizantes Saves $1.4M in Production Losses with Predix Asset Performanc
Reducing production lossesIn 2013, the company identified a need in the maintenance and operation of its acid nitric plant to reduce production losses and improve annual production. Vale noticed there was a gap in nitric acid production from 2011 to 2012 and discovered that three pieces of equipment were responsible for the main losses, including two weak acid condensers and a compressor discharge air cooler. The condenser’s losses were due to thickness loss, lack of availability of the spare condenser, and shell cracking.With a production loss above 14,000 tons in 15 months, Vale aimed to reduce annual loss by 10,000 tons by August 2015. 

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 Asia Growth Partners 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 Asia Growth Partners 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。